Enefit 280 Oilplant

Type: Boilers, Pipelines

Country: Estonia

Customer: Eesti Energia Tehnoloogitööstus AS / Eesti Energia Õlitööstus AS/ Outotec GmBH
Cost: 4,4 MEUR
Project finalization date: 01.11.2012

Technological pipelines erection (582 t), post-weld heat treatment, boiler erection (594 t), steel structures manufactururing and erection, installation of industrial equipments. Welded materials P235GH, 16Mo3, X6CrNiTi18-10, 10CrMo9-10; 1.4432; 1.4307, 13CrMo 4-5.