Type: Equipments, Pipelines, Steel structures, Tanks
Country: Estonia
Customer: Trendgate AS
Cost: 21 MEUR
Project finalization date: 01.10.2004
- Erection of tank farm: 6×30000 m3, 2×5000 m3;
- technological pipelines, railway loading estacade and structures, construction of pump house, installation on DN900 pipeline from terminal to Muuga port 9,7 km