Type: Gas
Country: Estonia
Customer: Elering AS
Cost: 14,5 MEUR
Project finalization date: 21.07.2020
- EPC contract. Construction consorcium with UAB Alvora and Eg Ehitus AS.
- Erection of 18 km (all together 54 km) DN700 gaspipe;
- Installation of 3 Line Valve stations; design pressure 54 bar