Baltic Connector Kiili-Paldiski

Type: Gas

Country: Estonia

Customer: Elering AS
Cost: 14,5 MEUR
Project finalization date: 21.07.2020

  • EPC contract. Construction consorcium with UAB Alvora and Eg Ehitus AS.
  • Erection of 18 km (all together 54 km) DN700 gaspipe;
  • Installation of 3 Line Valve stations; design pressure 54 bar