Gävle Biomass Plant

Type: Equipments, Pipelines, Steel structures

Country: Sweden

Customer: Technip Benelux B.V.
Project finalization date: 01.06.2021

  • Construction of Gävle Biomass Fast Pyrolysis Plant- core unit modules installation incl mechanical and E&I connections of modules;
  • flue gas system; equipment installation;
  • interconnecting piping prefabrication and installation including insulation;
  • steel structures manufacturing and installation; equipment shelter sandwich panels and HVAC installation;
  • E&I installation; detail design of interconnecting piping and E&I, equipment shelter including HVAC