Type: Equipments, Pipelines, Steel structures
Country: Sweden
Customer: Technip Benelux B.V.
Project finalization date: 01.06.2021
- Construction of Gävle Biomass Fast Pyrolysis Plant- core unit modules installation incl mechanical and E&I connections of modules;
- flue gas system; equipment installation;
- interconnecting piping prefabrication and installation including insulation;
- steel structures manufacturing and installation; equipment shelter sandwich panels and HVAC installation;
- E&I installation; detail design of interconnecting piping and E&I, equipment shelter including HVAC