Rail Baltic gas pipeline crossings at Ülemiste – Kangru

Type: Gas

Country: Estonia

Customer: Rail Baltic Estonia OÜ
Cost: 2,9 MEUR
Project finalization date: 19.12.2024

  • Relocation of high-pressure gas pipeline DN700 and DN500
  • Pressure 54 bar, total 1.9 km
  • Design, procurement of materials, installation, electrical and automation works, testing, BIM model and dismantling and disposal of the old pipeline